Metal Industry by Boja

The main objectives of Fabrica was to optimally load the batch furnaces, reduce the setups and eliminate late deliveries, while reducing overall project cycle times. Before using the APS, they needed a very high Work-In-Process (WIP) to keep the lines going, which meant a very high capital cost